build-workflow-plan

把 spec 拆成可执行的任务。当 spec 已批准需要拆分任务,或提到"计划""任务拆分""排期

Installation

$ npx skills add zeroz-lab/unified-skills --skill build-workflow-plan

Stronger alternatives

This repository is archived — consider an actively maintained alternative.

Similar popular skills

Related neighbors and high-traction skills in the same topics — useful to compare before installing.

Also in this package

Other skills from zeroz-lab/unified-skills · top by installs.

npx skills add zeroz-lab/unified-skills

Browse all from zeroz-lab/unified-skills

More details

Agent compatibility

Declared targets from SKILL.md / docs. Unmarked agents are not listed — the skill may still install via the CLI.

Claude Code Not declared
Cursor Not declared
Codex Not declared
GitHub Copilot Not declared
Windsurf Not declared
Gemini CLI Not declared
Cline Not declared
OpenCode Not declared

Repository health

Stars 16
License MIT
Default branch master
Open issues 0
Status Archived

Package contents

Files included with this skill beyond the listing page.

  • skill md SKILL.md 10,229 B
  • docs SUMMARY.md 140 B

History

  1. First recorded snapshot · 2 installs

SKILL.md

Plan — 任务分解

入口/出口

  • 入口: 已批准 spec(docs/features/YYYYMMDD-<name>/01-spec.md)+ 已批准 design(如 required)
  • 出口: docs/features/<name>/03-plan.md;大型/并行任务额外产出 docs/features/<name>/plans/*.md + 用户批准
  • 指向: 用户批准 plan 后必须调用 build-workflow-execute
  • 输出路径: → build-workflow-execute
  • 前置加载: CANON.md
  • 辅助参考: task-templates.md(任务模板、Subplan Contract、Parallel Safety 判定、代码示例规则)、plan-review.md(Plan Review Army 详细规则)

何时不使用

  • 变更只涉及 1-2 个文件且 scope 明显
  • spec 已经包含明确定义的任务(此时直接进入 build)

Agent Dispatch Contract

/plan 主执行 persona 是 agents/task-planner.md

  • Plan Review Army 在 Step 7.5 按 plan-review.md 最少触发条件选择 agents/plan-ceo-reviewer.mdagents/plan-eng-reviewer.mdagents/plan-design-reviewer.mdagents/plan-security-reviewer.md
  • 标准变更至少 CEO + Eng;大型、安全、合规或 --full 才全开
  • 未被选中的 reviewer 不产出占位反馈;所有已选 reviewer 反馈在 plan 批准前分级处理

核心锚点

Vertical Slicing

每个任务交付一个完整、可独立验证的功能路径。不按技术层水平切片。

执行规则:

  • Software:一个任务 = 一个用户路径(schema + API + UI),不拆成"建所有 DB → 建所有 API → 建所有 UI"
  • Content(document/article):一个章节 = 一个任务(目标 + 草稿 + 事实核查 + 编辑验证)
  • Deck:一组连续页面 = 一个任务(标题 + 内容 + 视觉 + speaker notes)
  • 任务标题出现 "and" = 拆分信号

Plan Topology

按依赖关系和并行需求选择拓扑。

执行规则:

  • serial:有序依赖、共享文件、小任务 → 只写 03-plan.md
  • parallel:无共享文件、无顺序依赖,且共享契约已冻结 → 03-plan.md + 多个 plans/*.md,标记 parallel_safe
  • gated-parallel:共享契约先定,后续可并行 → 03-plan.md + plans/01-contracts.md + 后续子计划
  • 实现顺序按依赖图自底向上;只有 Parallel Execution Matrix 标记 parallel_safe: yes 的子计划才能并行

Bite-sized Tasks

每个任务 3-7 步、≤5 文件、2-5 分钟可执行操作。

执行规则:

  • Software 任务用 RED → GREEN → REFACTOR 结构;非 software 用产物切片 + 验证证据结构
  • 禁止占位符:TBD/TODO/"implement later"/"添加适当的错误处理"(无具体代码)= plan 失败
  • 给执行 agent 提供方向和约束,不提供完整实现(复杂算法/安全逻辑/精确产物除外)

核心流程

Step 1:进入只读模式

不写代码。读取 spec、design 和相关代码库,识别模式和依赖。

单计划 vs 多计划决策门:

  • XS/S 任务:只写 03-plan.md
  • M/L 或跨子系统:03-plan.md 总控 + plans/*.md 子计划
  • 有共享契约但可拆分:先写 plans/01-contracts.md,后续子计划基于契约并行

Step 2:识别依赖图和 Plan Topology(锚点执行)

先读取 artifact_type 选择依赖图模型(software/content/deck/visual),再按 Plan Topology 锚点选择拓扑。

Step 3:确定文件结构

映射出哪些文件会被创建或修改。每个文件一个明确职责;一起变化的放一起;遵循现有模式。

如果 01-spec.mdDocumentation Impact 不是 feature_only,这里还必须映射 project doc 写入面:哪些是 root docs,哪些是 project docs,哪些继续留在 feature docs

Step 4:垂直切片(锚点执行)

Step 5:写 bite-sized 任务(锚点执行)

任务模板见 task-templates.md

Step 6:排序、Topology 和检查点

排列任务使依赖满足、系统保持可工作、高风险任务放前面、每 2-3 个任务设验证检查点。

多计划模式下 03-plan.md 必须包含:Subplans + Parallel Execution Matrix + Integration Order + Shared Contracts。任何子计划没有 Write Scope / Shared Contracts / Global Invariants / Cross-check Command / Semantic Independence Reason 不能分派;两个 parallel_safe 子计划 Write Scope 不能重叠,且共享契约必须已冻结。

Step 6.5:写 Project Doc Sync Plan

如果 spec 声明 projecttruthchanged: yesdocintent != featureonly03-plan.md 必须额外写:

  • Must update:本次必须同步的项目级文档路径
  • Optional update:可选同步,但不是发布门
  • Stage owner:由 /build/review/ship 哪个阶段收口
  • Verification method:如何判断这些文档已兑现
  • Deferred docs with reason:明确延后项和原因

即使 docintent: featureonly,也要显式写 Project Doc Sync Plan,并说明 not-needed

Step 7:自审

写完 plan 后对照以下 10 项检查:

  • Spec 覆盖:每条 spec 要求能找到对应任务
  • 占位符扫描:无 TBD/TODO/"implement later"/"添加适当的错误处理"
  • 类型一致性:后续任务的函数签名匹配前面定义的
  • Subplans 完整:每个 plans/*.md 存在且有 Subplan Contract
  • 并行安全:parallel_safe 子计划无重叠写入,且语义独立性已说明
  • 收口顺序:release/ship 类子计划默认串行
  • 任务独立性:每个任务有验收标准、独立验证步骤、依赖已标注
  • 验证完整性:每个验证步骤有具体命令 + 预期输出 + 失败诊断
  • 代码示例风格:最小示例 + 意图注释,无完整实现逻辑
  • 任务粒度:≤5 文件、3-7 步、标题无 "and"
  • 文档同步:如果 spec 要求同步 project docs,plan 已写 Project Doc Sync Plan

Step 7.5:Plan Review Army

自审通过后按风险升级执行 Review Army。详见 plan-review.md

Step 8:用户批准

验证失败处理

失败场景 处理方式
用户拒绝 plan 问清原因,修改 plan,重新提交
plan 遗漏 spec 需求 补充任务;每条 spec 需求必须能找到对应任务
依赖关系不正确 重做依赖图验证
任务过大 分解到 ≤5 文件;标题出现 "and" = 拆分
验收条件缺失 强制补充;无验收条件的任务不能进入 build
parallel_safe 写入重叠 标记为串行,调整 Integration Order
shared contract / global invariant 未冻结 改为 gated-parallel 或串行
spec 要求同步 project docs 但 plan 未写 owner / verification 阻塞。补 Project Doc Sync Plan 后再进入 build

常见说辞

说辞 现实 后果
"边做边想" 10 分钟计划节省数小时。 无计划遗漏 2-3 个依赖,每个导致 2-4 小时返工
"任务很明显不需要写下来" 写下来暴露隐藏依赖和边界情况。 未记录的"明显"任务隐藏 1-2 个边界,上线后 bug
"计划就是开销" 计划就是任务。没计划的实现只是在打字。 无计划 → 依赖混乱 → 集成阶段 >50% 代码需重排
"之后补验收条件" 没有验收条件就无法判断"做完"。 后补验收条件倾向顺应已实现行为,遗漏被永久锁定

红旗

  • 没有书面任务清单就开始实现
  • 任务说"实现功能"但没有验收条件
  • plan 中没有验证步骤
  • spec 里说要同步 project docs,但 plan 没写 Project Doc Sync Plan
  • 所有任务都是 L 或 XL 大小
  • 阶段之间没有检查点
  • 依赖顺序没有执行
  • plan 中任务标题出现 "and"(= 两个任务)

验证清单

  • 每个任务有验收条件和验证步骤
  • 任务依赖已识别并正确排序
  • 没有任务超过 ~5 个文件
  • 主要阶段间设了检查点
  • plan 没有占位符
  • spec 每个需求在 plan 中都有对应任务
  • Project Doc Sync Plan 已存在;需要同步时包含 owner / verification / deferred reason
  • 多计划任务有 Subplans、Parallel Execution Matrix、Integration Order
  • parallel_safe 子计划之间没有重叠写入
  • 用户已审查并批准 plan

好坏示例

Good — 垂直切片 + 验收条件

Task 1: 用户注册 — Files: User.ts, register.ts, RegisterForm.tsx
  Step 1: 定义 schema → 验证: prisma validate
  Step 2: 实现 API → 验证: curl POST /api/register → 201
  Step 3: 实现 UI → 验证: 浏览器提交表单 → 成功提示
  Verification: npm test --coverage --grep register > 80%

Bad — 水平切片 + 无验收

Task 1: 建数据库(整个 schema)
Task 2: 建所有 API
Task 3: 建所有 UI
→ 水平切片: Task 3 完成前无法验证任何用户路径
→ 无验收条件: "建完"无法判定
→ 依赖链过长: 任何前置阻塞后续全部

输出模板

### Plan — <feature-name>

Plan Topology: [serial / parallel / gated-parallel] | artifact_type: [software/...]

Project Doc Sync Plan:
- Must update: [paths or none]
- Optional update: [paths or none]
- Stage owner: [phase / task]
- Verification method: [review / validate / manual]
- Deferred docs with reason: [items or none]

Task 清单:
| Task N | 标题 | 文件数 | 验收条件 | 验证命令 | 依赖 |
|--------|------|-------|---------|---------|------|
| 1 | [标题] | [N] | [条件] | [命令] | [无/Task N] |

子计划索引(如适用):
| 子计划 | Write Scope | Shared Contracts | Cross-check Command | parallel_safe | 依赖 | 验证 |
|--------|------------|------------------|---------------------|--------------|------|------|
| plans/01-*.md | [范围] | [契约] | [命令] | [yes/no] | [依赖] | [命令] |

Parallel Execution Matrix(如适用):
| A | B | safe | 无重叠 |
|---|---|------|--------|
| [1] | [2] | [yes/no] | [✓/✗] |

用户批准: [已批准 / 待批准]