smithery/breverdbidder

environmental-permitting

Florida environmental permitting expertise. Invoke for SJRWMD permits, wetland assessments, flood zone analysis, or stormwater requirements.

Installation

$ npx skills add smithery/breverdbidder --skill environmental-permitting

Similar popular skills

Related neighbors and high-traction skills in the same topics — useful to compare before installing.

Also in this package

Other skills from smithery/breverdbidder.

npx skills add smithery/breverdbidder

Browse all from smithery/breverdbidder

More details

Agent compatibility

Declared targets from SKILL.md / docs. Unmarked agents are not listed — the skill may still install via the CLI.

Claude Code Not declared
Cursor Not declared
Codex Not declared
GitHub Copilot Not declared
Windsurf Not declared
Gemini CLI Not declared
Cline Not declared
OpenCode Not declared

Skill metadata

Parsed from SKILL.md frontmatter.

Allowed toolsRead, Write, Bash

Package contents

Files included with this skill beyond the listing page.

  • skill md SKILL.md 2,273 B
  • docs SUMMARY.md 172 B

History

  1. First recorded snapshot · 0 installs

SKILL.md

Florida Environmental Permitting Skill

When to Invoke

  • Questions about SJRWMD permits
  • Wetland assessment needs
  • Flood zone determination
  • Stormwater management
  • Environmental constraints

SJRWMD Permit Types

ERP (Environmental Resource Permit)

Required for:

  • Projects disturbing >1 acre
  • Work in wetlands
  • Stormwater systems
  • Activities in/near surface waters

Thresholds:

  • <4,000 sq ft impervious: Exempt
  • 4,000 sq ft - 1 acre: Noticed General
  • >1 acre: Individual permit

WUP (Water Use Permit)

Required for:

  • Irrigation systems >1 acre
  • Commercial water use
  • Dewatering operations

Flood Zone Determination

FEMA Zone Designations

Zone Risk Level Requirements
X Minimal Standard construction
A High (no BFE) Elevation required
AE High (BFE known) Build above BFE
VE Coastal high hazard Strict requirements

Building Requirements by Zone

  • Zone X: No special requirements
  • Zone A/AE: Lowest floor ≥ BFE + 1 ft
  • Zone VE: Open foundation, ≥ BFE + 1 ft

Wetland Assessment Process

  1. Desktop Review

- Check National Wetlands Inventory (NWI) - Review aerial imagery - Identify potential wetland areas

  1. Field Delineation (if needed)

- Hire certified wetland delineator - Flag wetland boundaries - Prepare delineation report

  1. Permit Strategy

- Avoid: Best option - Minimize: Reduce impact - Mitigate: Compensate for unavoidable impact

Stormwater Requirements

Retention/Detention

  • Pre vs post development runoff
  • 25-year, 24-hour storm
  • Water quality treatment

Common Solutions

  • Retention ponds
  • Dry detention
  • Swales
  • Underground systems

Timeline Estimates

Permit Review Time
ERP General 30 days
ERP Individual 90 days
WUP 90 days
Wetland Delineation 30-60 days

Key Contacts

  • SJRWMD: 386-329-4500
  • FDEP: 850-245-2118
  • US Army Corps: 904-232-1666