smithery.ai

project-pulse-brief

Curate stakeholder-ready pulse briefs that summarize project portfolio updates, risks, and next steps.

First seen Apr 7, 2026

Installation

$ npx skills add https://smithery.ai

Similar popular skills

Related neighbors and high-traction skills in the same topics — useful to compare before installing.

Also in this package

Other skills from smithery.ai · top by installs.

npx skills add https://smithery.ai

Browse all from smithery.ai

More details

Agent compatibility

Declared targets from SKILL.md / docs. Unmarked agents are not listed — the skill may still install via the CLI.

Claude Code Not declared
Cursor Not declared
Codex Declared
GitHub Copilot Not declared
Windsurf Not declared
Gemini CLI Not declared
Cline Not declared
OpenCode Not declared

Skill metadata

Parsed from SKILL.md frontmatter.

Version1.1.2
LicenseComplete terms in LICENSE.txt
Declared agents codex

Package contents

Files included with this skill beyond the listing page.

  • skill md SKILL.md 4,832 B
  • docs SUMMARY.md 129 B

History

  1. First seen on skills.sh
  2. First recorded snapshot · 1 installs

SKILL.md

Project Pulse Brief

Overview

Project Pulse Brief is a lightweight playbook for turning raw project status updates into an executive-ready pulse brief. The skill focuses on repeatable steps, reusable checklists, and a template you can copy into any document or collaboration space. No scripts, bots, or external integrations are required.

Integration Policy

When automating email or calendar lookups as part of this workflow, always delegate to the unified skills — do NOT call Gmail or Google Calendar tools directly.

Need Delegate to
Project-related email threads daily-emails topic sub-command
Upcoming project meetings daily-calendars search sub-command

These skills own the connector policy (native first, Zapier fallback) and output formatting.

Quick Start

  1. Collect weekly status inputs from project leads by reviewing your shared

project email thread (use daily-emails topic with the project name) and the relevant Google Drive folders.

  1. Open assets/templates/pulsebrieftemplate.md and duplicate it in your

preferred editor or knowledge base.

  1. Summarize the latest highlights, watchlist items, risks, and next steps

directly from the email and Drive updates.

  1. Share the completed brief with stakeholders via your usual communication

channels (email, workspace doc, meeting deck, etc.).

What This Skill Provides

  • Repeatable workflow for consolidating project updates each reporting

cycle.

  • Editable template that keeps highlights, blockers, and upcoming work in a

consistent structure.

  • Curation checklist to maintain quality: confirm owner, dates, status, and

key decisions before publishing.

What This Skill Does NOT Provide

✗ Automated data ingestion from portfolio tools. ✗ Command-line utilities or runtime scripts. ✗ Direct integrations with chat platforms or email services.

Recommended Workflow

  1. Skim project email updates and shared Drive docs to capture the latest wins,

issues, and upcoming milestones.

  1. During a short review session, triage updates into highlights, watchlist, and

risks so the brief stays focused on executive-ready talking points.

  1. Populate the markdown template with the agreed priorities. Use callouts or

bolding (see template) to emphasize decisions and support requests.

  1. Capture follow-up actions in a shared tracker so the next brief can close the

loop on open items.

Success Criteria

  • Every project entry lists owner, current status, recent wins, blockers, and

next steps.

  • Sponsors can skim the brief and understand portfolio health within two

minutes.

  • Follow-up actions from the previous pulse are either completed or reprioritized

in the new brief.

Roles & Responsibilities

  • Brief Curator: Coordinates intake, validates completeness, and drafts the

pulse brief.

  • Project Leads: Provide weekly updates aligned to the required fields.
  • Executive Sponsor: Reviews the brief for alignment and approves

distribution.

Guardrails

  • Keep the brief under two pages to preserve executive readability.
  • Highlight no more than five items per section; link to supplemental docs for

deep dives.

  • Use neutral, objective tone—avoid speculative language without data backing.
  • Document open risks with clear owners and mitigation dates.

Troubleshooting

  • Missing information? Send a quick reply-all on the project email thread with a

bulleted request for the specific details you need.

  • Conflicting updates? Leave a comment in the source Drive doc or schedule a

short huddle to resolve the discrepancy before publishing.

  • Updates running long? Prioritize the bullets that require decisions and move

the rest into linked reference docs.

Related Skills

  • daily-work: Pair with Project Pulse Brief for a wider view of

operational signals plus delivery progress.

  • daily-files: Use the topic or recent sub-commands to locate supporting

artifacts referenced in the pulse brief.

Version History

  • 1.1.2 (2024-03-13): Simplified the workflow to rely solely on email and

Google Drive inputs—no supplemental guides required.

  • 1.1.1 (2024-03-12): Removed the project update worksheet in favor of

lightweight intake prompts embedded in the configuration guide.

  • 1.1.0 (2024-03-11): Simplified into a documentation-first workflow without

CLI tooling or chat integrations.

  • 1.0.0 (2024-03-09): Initial release with automation scripts.