SKILL.md
Lunar Landers Expert Skill
Domain Knowledge
- Directory:
landers/(contains individual*.MDfiles for each lander) - Metadata Format: YAML frontmatter at the top of each file with fields:
id,name,provider,class,status,physical(capacity),power,comms. - Unit Standards: Metric System Only. Convert all imperial units (lbf, lbs, inches) to SI/Metric (N, kg, m, km, kPa, °C) during extraction.
- Common Bus Logic: Many providers (e.g., Astrobotic) use a "Common Spacecraft Bus." Specifications valid for one lander in a family (e.g., Peregrine) are often inherited by larger variants (e.g., Griffin) unless specified otherwise. Note: Specific subsystems (Propulsion mix, Antenna gain, Power generation) are often upgraded for larger variants.
- Primary Source: Payload User's Guide (PUG) is the gold standard for technical ground-truth.
Instructions
- Exhaustive Interface Mapping:
- Wired Connection: Document physical connector standards (e.g., MIL-DTL-38999 Series III / Glenair SuperNine), pinout variants (e.g., Regular vs Small SEC), and supported protocols (RS-422/SLIP/UDP, SpaceWire). - Wireless Connection: Map 802.11n/Wi-fi details, especially for deployed rovers. - Timing Services: Note "Time at the Tone" or NTP-equivalent UTC synchronization.
- Environmental & Structural Load Analysis:
- Mechanical Loads: Extract Random Vibration (Grms), Shock (G peak), and Acoustic (dB/Freq) qualification levels. Note duration (e.g., 2 mins/axis). - Atmospheric/Pressure: Document pressure drop rates (kPa/s) and humidity limits (Pre-launch). - Radiation: Differentiate between near-Earth (Van Allen) and interplanetary dosage (rad/day). - EMI/EMC: Cite specific standards (e.g., MIL-STD-461G) and test categories (CE102, RE102, etc.).
- Phase-Specific Service Modes:
- Build matrices for Power (Nominal/Peak/Release in W/kg) and Data (Heartbeat/Nominal/Release in bps or kbps/kg). - Identify duty cycles (e.g., 8-hour AOS/LOS cycles) and service durations (e.g., 60s release window).
- Landing & Deployment Logic:
- Geographic Precision: Catalog landing accuracy (m), effective slope limits (degrees), and rock hazard tolerances (m). - Solar Logic: Distinguish between Top-mounted (equatorial/mid-lat) and Side-mounted (polar) configurations. - Deployment (Egress): Document Safe/Arm/Fire logic, separation velocities (e.g., 0.04 m/s in orbit), and verification methods (visual/telemetry).
- Mission Trajectory & Orbits:
- Detail specific parking/deployment orbits (LO1/LO2/LO3) with altitudes (km) and durations (hours). - Map the descent profile from coasting to terminal nadir (m).
- Service Economics:
- Standard pricing per kg (Orbit/Surface/Rover). - Auxiliary services (e.g., DHL MoonBox) and small payload (<1kg) surcharges.
- Avionics & Software Architecture:
- Computing: Extract flight processor types (e.g., LEON3 FT 32-bit), and identify if a separate Payload Computer (e.g., FPGA-based) manages customer interfaces. - Telemetry Path: Document how data is handled (e.g., "Transparent VPN Tunneling" vs. "Command Processing"). Note support for end-to-end encryption. - Power Rail: Capture the standard voltage (e.g., 28 Vdc) and whether it is regulated or unregulated.
- Integration & Documentation Suite:
- Milestones: Catalog the full mission review sequence in "L-Minus Months": - PDR/CDR: Design phase reviews. - PAR: Payload Acceptance Review (L-9). - SIR/TRR/ORR: Readiness reviews for integration, testing, and operations. - Required Documents: Check for the full standard suite: - PSA/SOW: Overarching contract and scope. - IDD/ICD: Interface standards and payload-specific controls. - PIP/POP: Integration schedules and handling procedures.
- Mechanical Mounting & Mass Accounting:
- Adapter Plates: Note if adapter plates are required and if their mass counts against the payload allocation. - Physical Interfaces: Capture bolt patterns (e.g., M5 / 75mm) and grounding requirements (e.g., VPC bonding).
- Planetary Protection & Cleanliness:
- Outgassing: Capture TML (%) and CVCM (%) limits (e.g., NASA standard 1.0%/0.1%). - Ground Purging: Note if N2 or other purging is supported during integration/pre-launch. - Cleanroom: Document the ISO classification (e.g., ISO Class 8).
- Ground Segment & Operations:
- Mission Control: Identify the central control hub (e.g., AMCC). - Customer Access: Document how customers interface (e.g., Remote VPN vs On-site PMCC). - Staffing: Note any requirements for on-site personnel during the mission.
- Landing Site Constraints:
- Solar Timing: Look for "Hours after sunrise" landing constraints (critical for thermal/battery). - Hazard Limits: Catalog specific rock height (m) and slope (°) limits.
- Source & Entity Context:
- Cite PUG versions. Link provider to SPACE_ENTITIES.MD.