Estimate software development tasks accurately using various techniques. Use when planning sprints, roadmaps, or project timelines. Handles story points, t-shirt sizing, planning poker, and estimation best practices.

Installation

$ npx skills add https://modelscope.cn

Similar popular skills

Related neighbors and high-traction skills in the same topics — useful to compare before installing.

Also in this package

Other skills from modelscope.cn · top by installs.

npx skills add https://modelscope.cn

Browse all from modelscope.cn

More details

Agent compatibility

Declared targets from SKILL.md / docs. Unmarked agents are not listed — the skill may still install via the CLI.

Claude Code Declared
Cursor Not declared
Codex Not declared
GitHub Copilot Not declared
Windsurf Not declared
Gemini CLI Declared
Cline Not declared
OpenCode Not declared

Skill metadata

Parsed from SKILL.md frontmatter.

Declared agents claude-code gemini
More metadata
tags
estimation, agile, sprint-planning, story-points, planning-poker
platforms
Claude, ChatGPT, Gemini

Package contents

Files included with this skill beyond the listing page.

  • skill md SKILL.md 5,104 B

History

  1. First recorded snapshot · 0 installs

SKILL.md

Task Estimation

When to use this skill

  • Sprint Planning: Decide what work to include in the sprint
  • Roadmap creation: Build long-term plans
  • Resource planning: Estimate team size and schedule

Instructions

Step 1: Story Points (relative estimation)

Fibonacci sequence: 1, 2, 3, 5, 8, 13, 21

## Story Point guidelines

### 1 Point (Very Small)
- Example: text change, constant value update
- Time: 1-2 hours
- Complexity: very low
- Risk: none

### 2 Points (Small)
- Example: simple bug fix, add logging
- Time: 2-4 hours
- Complexity: low
- Risk: low

### 3 Points (Medium)
- Example: simple CRUD API endpoint
- Time: 4-8 hours
- Complexity: medium
- Risk: low

### 5 Points (Medium-Large)
- Example: complex form implementation, auth middleware
- Time: 1-2 days
- Complexity: medium
- Risk: medium

### 8 Points (Large)
- Example: new feature (frontend + backend)
- Time: 2-3 days
- Complexity: high
- Risk: medium

### 13 Points (Very Large)
- Example: payment system integration
- Time: 1 week
- Complexity: very high
- Risk: high
- **Recommended**: Split into smaller tasks

### 21+ Points (Epic)
- **Required**: Must be split into smaller stories

Step 2: Planning Poker

Process:

  1. Product Owner explains the story
  2. Team asks questions
  3. Everyone picks a card (1, 2, 3, 5, 8, 13)
  4. Reveal simultaneously
  5. Explain highest/lowest scores
  6. Re-vote
  7. Reach consensus

Example:

Story: "Users can upload a profile photo"

Member A: 3 points (simple frontend)
Member B: 5 points (image resizing needed)
Member C: 8 points (S3 upload, security considerations)

Discussion:
- Use an image processing library
- S3 is already set up
- File size validation needed

Re-vote → consensus on 5 points

Step 3: T-Shirt Sizing (quick estimation)

## T-Shirt sizes

- **XS**: 1-2 Story Points (within 1 hour)
- **S**: 2-3 Story Points (half day)
- **M**: 5 Story Points (1-2 days)
- **L**: 8 Story Points (1 week)
- **XL**: 13+ Story Points (needs splitting)

**When to use**:
- Initial backlog grooming
- Rough roadmap planning
- Quick prioritization

Step 4: Consider risk and uncertainty

Estimation adjustment:

interface TaskEstimate {
  baseEstimate: number;      // base estimate
  risk: 'low' | 'medium' | 'high';
  uncertainty: number;        // 0-1
  finalEstimate: number;      // adjusted estimate
}

function adjustEstimate(estimate: TaskEstimate): number {
  let buffer = 1.0;

  // risk buffer
  if (estimate.risk === 'medium') buffer *= 1.3;
  if (estimate.risk === 'high') buffer *= 1.5;

  // uncertainty buffer
  buffer *= (1 + estimate.uncertainty);

  return Math.ceil(estimate.baseEstimate * buffer);
}

// Example
const task = {
  baseEstimate: 5,
  risk: 'medium',
  uncertainty: 0.2  // 20% uncertainty
};

const final = adjustEstimate(task);  // 5 * 1.3 * 1.2 = 7.8 → 8 points

Output format

Estimation document template

## Task: [Task Name]

### Description
[work description]

### Acceptance Criteria
- [ ] Criterion 1
- [ ] Criterion 2
- [ ] Criterion 3

### Estimation
- **Story Points**: 5
- **T-Shirt Size**: M
- **Estimated Time**: 1-2 days

### Breakdown
- Frontend UI: 2 points
- API Endpoint: 2 points
- Testing: 1 point

### Risks
- Uncertain API response time (medium risk)
- External library dependency (low risk)

### Dependencies
- User authentication must be completed first

### Notes
- Need to discuss design with UX team

Constraints

Required rules (MUST)

  1. Relative estimation: Relative complexity instead of absolute time
  2. Team consensus: Agreement from the whole team, not individuals
  3. Use historical data: Plan based on velocity

Prohibited (MUST NOT)

  1. Pressuring individuals: Estimates are not promises
  2. Overly granular estimation: Split anything 13+ points
  3. Turning estimates into deadlines: estimate ≠ commitment

Best practices

  1. Break Down: Split big work into smaller pieces
  2. Reference Stories: Reference similar past work
  3. Include buffer: Prepare for the unexpected

References

Metadata

Version

  • Current version: 1.0.0
  • Last updated: 2025-01-01
  • Compatible platforms: Claude, ChatGPT, Gemini

Tags

#estimation #agile #story-points #planning-poker #sprint-planning #project-management