ryanthedev/code-foundations · Archived
aposd-optimizing-critical-paths
Optimize performance through mandatory measure-first workflow with 3 stages: MEASURE (gate) -> FUNDAMENTAL FIX -> CRITICAL PATH REDESIGN. Use when code is too…
Installation
npx skills add https://github.com/ryanthedev/code-foundations
Stronger alternatives
This repository is archived — consider an actively maintained alternative.
Applies Code Complete's defensive programming rules: barricade design, assertion vs error-handl…
45 installsGuides safe refactoring using Code Complete's fix-first-then-refactor discipline: decides betwe…
6 installsDecomposes underspecified requests by classifying gaps (missing info, ambiguity, false premises…
5 installsAudits and restructures control flow using Code Complete's nesting, cyclomatic complexity, loop…
5 installsSimilar popular skills
Related neighbors and high-traction skills in the same topics — useful to compare before installing.
Browser automation CLI for AI agents. Use when the user needs to interact with websites, includ…
11.9K installsReview UI code for Web Interface Guidelines compliance. Use when asked to "review my UI", "chec…
4.7K installsBuild, deploy, evaluate, optimize, fine-tune, and manage Microsoft Foundry agents, models, and …
1.7K installsPostgres best practices maintained by Supabase, for Postgres running anywhere. Load this skill …
1.4K installsArchitect and provision enterprise Azure infrastructure from workload descriptions. For cloud a…
1.5K installs>- Guides and best practices for working with Lakebase Postgres, the database behind Neon. Cove…
3.2K installsAlso in this package
Other skills from ryanthedev/code-foundations · top by installs.
npx skills add https://github.com/ryanthedev/code-foundations
More details
Agent compatibility
Declared targets from SKILL.md / docs. Unmarked agents are not listed — the skill may still install via the CLI.
Repository health
main
History
- First seen on skills.sh
- First recorded snapshot · 1 installs