pjt222/agent-almanac

write-validation-documentation

Write IQ/OQ/PQ validation documentation for computerized systems in regulated environments. Covers protocols, reports, test scripts, deviation handling, and approval workflows. Use when validating R or other software for regulated use, preparing for a regulatory audit, documenting qualification of computing environments, or creating and updating validation protocols and reports for new or re-qualified systems.

First seen Feb 27, 2026

Installation

$ npx skills add pjt222/agent-almanac --skill write-validation-documentation

Similar popular skills

Related neighbors and high-traction skills in the same topics — useful to compare before installing.

Also in this package

Other skills from pjt222/agent-almanac · top by installs.

npx skills add pjt222/agent-almanac

Browse all from pjt222/agent-almanac

More details

Agent compatibility

Declared targets from SKILL.md / docs. Unmarked agents are not listed — the skill may still install via the CLI.

Claude Code Not declared
Cursor Not declared
Codex Not declared
GitHub Copilot Not declared
Windsurf Not declared
Gemini CLI Not declared
Cline Not declared
OpenCode Not declared

Repository health

Stars 32
License LICENSE
Default branch main
Open issues 151
Status Active

Skill metadata

Parsed from SKILL.md frontmatter.

Version1.0
LicenseMIT
Allowed toolsRead Write Edit Bash Grep Glob
More metadata
author
Philipp Thoss
version
1.0
domain
compliance
complexity
advanced
language
R
tags
validation, iq-oq-pq, documentation, gxp, qualification

Package contents

Files included with this skill beyond the listing page.

  • skill md SKILL.md 9,649 B
  • docs SUMMARY.md 451 B

History

  1. First seen on skills.sh
  2. First recorded snapshot · 20 installs

SKILL.md

Write Validation Documentation

Create complete IQ/OQ/PQ validation documentation for computerized systems.

When to Use

  • Validating R or other software for regulated use
  • Preparing for regulatory audit
  • Documenting qualification of computing environments
  • Creating or updating validation protocols and reports

Inputs

  • Required: System/software to validate (name, version, purpose)
  • Required: Validation plan defining scope and strategy
  • Required: User requirements specification
  • Optional: Existing SOP templates
  • Optional: Previous validation documentation (for re-qualification)

Procedure

Step 1: Write Installation Qualification (IQ) Protocol

# Installation Qualification Protocol
**System**: R Statistical Computing Environment
**Version**: 4.5.0
**Document ID**: IQ-PROJ-001
**Prepared by**: [Name] | **Date**: [Date]
**Reviewed by**: [Name] | **Date**: [Date]
**Approved by**: [Name] | **Date**: [Date]

## 1. Objective
Verify that R and required packages are correctly installed per specifications.

## 2. Prerequisites
- [ ] Server/workstation meets hardware requirements
- [ ] Operating system qualified
- [ ] Network access available (for package downloads)

## 3. Test Cases

### IQ-001: R Installation
| Field | Value |
|-------|-------|
| Requirement | R version 4.5.0 correctly installed |
| Procedure | Open R console, execute `R.version.string` |
| Expected Result | "R version 4.5.0 (2025-04-11)" |
| Actual Result | ______________________ |
| Pass/Fail | [ ] |
| Executed by | ____________ Date: ________ |

### IQ-002: Package Inventory
| Package | Required Version | Installed Version | Pass/Fail |
|---------|-----------------|-------------------|-----------|
| dplyr | 1.1.4 | | [ ] |
| ggplot2 | 3.5.0 | | [ ] |
| survival | 3.7-0 | | [ ] |

## 4. Deviations
[Document any deviations from expected results and their resolution]

## 5. Conclusion
[ ] All IQ tests PASSED - system installation verified
[ ] IQ tests FAILED - see deviation section

Expected: validation/iq/iq_protocol.md is complete with a unique document ID, objective, prerequisites checklist, test cases for R installation and every required package, deviation section, and approval fields.

On failure: If the organization requires a different document format, adapt the template to match the existing SOP. The key fields (requirement, procedure, expected result, actual result, pass/fail) must be preserved regardless of format.

Step 2: Write Operational Qualification (OQ) Protocol

# Operational Qualification Protocol
**Document ID**: OQ-PROJ-001

## 1. Objective
Verify that the system operates correctly under normal conditions.

## 2. Test Cases

### OQ-001: Data Import Functionality
| Field | Value |
|-------|-------|
| Requirement | System correctly imports CSV files |
| Test Data | validation/test_data/import_test.csv (MD5: abc123) |
| Procedure | Execute `read.csv("import_test.csv")` |
| Expected | Data frame with 100 rows, 5 columns |
| Actual Result | ______________________ |
| Evidence | Screenshot/log file reference |

### OQ-002: Statistical Calculations
| Field | Value |
|-------|-------|
| Requirement | t-test produces correct results |
| Test Data | Known dataset: x = c(2.1, 2.5, 2.3), y = c(3.1, 3.5, 3.3) |
| Procedure | Execute `t.test(x, y)` |
| Expected | t = -5.000, df = 4, p = 0.00753 |
| Actual Result | ______________________ |
| Tolerance | ±0.001 |

### OQ-003: Error Handling
| Field | Value |
|-------|-------|
| Requirement | System handles invalid input gracefully |
| Procedure | Execute `analysis_function(invalid_input)` |
| Expected | Informative error message, no crash |
| Actual Result | ______________________ |

Expected: validation/oq/oq_protocol.md contains test cases for data import, statistical calculations, and error handling, each with specific test data, expected results (with tolerances where applicable), and evidence requirements.

On failure: If test data is not yet available, create synthetic test datasets with known properties. Document the data generation method so results can be independently verified.

Step 3: Write Performance Qualification (PQ) Protocol

# Performance Qualification Protocol
**Document ID**: PQ-PROJ-001

## 1. Objective
Verify the system performs as intended with real-world data and workflows.

## 2. Test Cases

### PQ-001: End-to-End Primary Analysis
| Field | Value |
|-------|-------|
| Requirement | Primary endpoint analysis matches reference |
| Test Data | Blinded test dataset (hash: sha256:abc...) |
| Reference | Independent SAS calculation (report ref: SAS-001) |
| Procedure | Execute full analysis pipeline |
| Expected | Estimate within ±0.001 of reference |
| Actual Result | ______________________ |

### PQ-002: Report Generation
| Field | Value |
|-------|-------|
| Requirement | Generated report contains all required sections |
| Procedure | Execute report generation script |
| Checklist | |
| | [ ] Title page with study information |
| | [ ] Table of contents |
| | [ ] Demographic summary table |
| | [ ] Primary analysis results |
| | [ ] Appendix with session info |

Expected: validation/pq/pq_protocol.md contains end-to-end test cases using real-world (or representative) data, with results compared against an independent reference calculation (e.g., SAS output). Tolerances are explicitly defined.

On failure: If independent reference results are not available, document the gap and use dual-programming (two independent R implementations) as an alternative verification method. Flag the PQ as provisional until independent verification is complete.

Step 4: Write Qualification Reports

After executing protocols, document results:

# Installation Qualification Report
**Document ID**: IQ-RPT-001
**Protocol Reference**: IQ-PROJ-001

## 1. Summary
All IQ test cases were executed on [date] by [name].

## 2. Results Summary
| Test ID | Description | Result |
|---------|-------------|--------|
| IQ-001 | R Installation | PASS |
| IQ-002 | Package Inventory | PASS |

## 3. Deviations
None observed.

## 4. Conclusion
The installation of R 4.5.0 and associated packages has been verified
and meets all specified requirements.

## 5. Approvals
| Role | Name | Signature | Date |
|------|------|-----------|------|
| Executor | | | |
| Reviewer | | | |
| Approver | | | |

Expected: Qualification reports (IQ, OQ, PQ) are complete with all test results filled in, deviations documented (or "None observed"), conclusions stated, and approval signature fields ready for sign-off.

On failure: If test failures occurred during execution, document each failure as a deviation with root cause analysis and resolution. Do not leave deviation sections blank when failures were observed.

Step 5: Automate Where Possible

Create automated test scripts that generate evidence:

# validation/scripts/run_iq.R
sink("validation/iq/iq_evidence.txt")
cat("IQ Execution Date:", format(Sys.time()), "\n\n")

cat("IQ-001: R Version\n")
cat("Result:", R.version.string, "\n")
cat("Status:", ifelse(R.version$major == "4" && R.version$minor == "5.0",
                      "PASS", "FAIL"), "\n\n")

cat("IQ-002: Package Versions\n")
required <- renv::dependencies()
installed <- installed.packages()
# ... comparison logic
sink()

Expected: Automated scripts in validation/scripts/ generate evidence files (e.g., iq_evidence.txt) with timestamped results for each test case, reducing manual data entry and ensuring reproducibility.

On failure: If automated scripts fail due to environment differences, run them manually and capture output with sink(). Document any differences between automated and manual execution in the qualification report.

Validation

  • All protocols have unique document IDs
  • Protocols reference the validation plan
  • Test cases have clear pass/fail criteria
  • Reports include all executed test results
  • Deviations are documented with resolutions
  • Approval signatures are obtained
  • Documents follow organization's SOP templates

Common Pitfalls

  • Vague acceptance criteria: "System works correctly" is not testable. Specify exact expected values.
  • Missing evidence: Every test result needs supporting evidence (screenshots, logs, output files)
  • Incomplete deviation handling: All failures must be documented, investigated, and resolved
  • No version control for documents: Validation docs need change control just like code
  • Skipping re-qualification: System updates (R version, package updates) require re-qualification assessment

Related Skills

  • setup-gxp-r-project - project structure for validated environments
  • implement-audit-trail - electronic records tracking
  • validate-statistical-output - output validation methodology