nyldn/claude-octopus

skill-cost-projections

Project remaining workflow cost from per-phase averages — warns on budget ceiling overruns

First seen Mar 23, 2026

Installation

$ npx skills add nyldn/claude-octopus --skill skill-cost-projections

Similar popular skills

Related neighbors and high-traction skills in the same topics — useful to compare before installing.

Also in this package

Other skills from nyldn/claude-octopus · top by installs.

npx skills add nyldn/claude-octopus

Browse all from nyldn/claude-octopus

More details

Agent compatibility

Declared targets from SKILL.md / docs. Unmarked agents are not listed — the skill may still install via the CLI.

Claude Code Not declared
Cursor Not declared
Codex Not declared
GitHub Copilot Not declared
Windsurf Not declared
Gemini CLI Not declared
Cline Not declared
OpenCode Not declared

Repository health

Stars 4.0K
License licenses
Default branch main
Open issues 3
Status Active

Package contents

Files included with this skill beyond the listing page.

  • skill md SKILL.md 6,896 B
  • docs SUMMARY.md 122 B

History

  1. First seen on skills.sh
  2. First recorded snapshot · 30 installs

SKILL.md

Cost Projections Skill

Overview

Projects remaining workflow cost based on per-phase averages from completed work. Displays cost data in the HUD/statusline and warns when projected totals exceed a configured budget ceiling.

Minimum data requirement: Needs 2+ completed steps before projecting. With fewer than 2 data points, the average is unreliable — display actual spend only and skip projection.


Step 1: Collect Completed Phase Costs

Read cost data from ~/.claude-octopus/metrics/ or from metrics-tracker.sh output. Each completed phase/step should have an associated cost entry.

# Read metrics from the session metrics directory
METRICS_DIR="$HOME/.claude-octopus/metrics"
SESSION_METRICS="$METRICS_DIR/session-$(date +%Y%m%d).jsonl"

# Each line contains: {"phase": "discover", "cost": 0.42, "tokens_in": 12000, "tokens_out": 3400, "timestamp": "..."}
# Sum costs from completed steps
completed_costs=$(jq -s '[.[].cost]' "$SESSION_METRICS")
completed_count=$(jq -s 'length' "$SESSION_METRICS")
total_spent=$(jq -s '[.[].cost] | add' "$SESSION_METRICS")

Data sources (in priority order):

  1. ~/.claude-octopus/metrics/session-*.jsonl — structured per-phase cost entries
  2. metrics-tracker.sh output — fallback for legacy sessions
  3. HUD accumulated cost counters — last resort

If fewer than 2 completed steps are available, display only actual spend:

💰 Spent: $0.42 (1 step complete — need 2+ for projection)

Step 2: Compute Average Cost Per Step

Calculate the mean cost across all completed steps.

avg_cost=$(echo "$total_spent / $completed_count" | bc -l)

Formula:

avg_cost = total_cost / completed_steps

Example: If 3 steps cost $0.30, $0.50, $0.40 → avg = $1.20 / 3 = $0.40/step


Step 3: Project Remaining Cost

Multiply the average cost per step by the number of remaining steps.

remaining_steps=$((total_steps - completed_count))
projected_remaining=$(echo "$avg_cost * $remaining_steps" | bc -l)
projected_total=$(echo "$total_spent + $projected_remaining" | bc -l)

Formula:

projected_remaining = avg_cost × remaining_steps
projected_total     = total_spent + projected_remaining

Step counts by workflow type:

Workflow Total Steps Example Phases
embrace 4 Discover, Define, Develop, Deliver
research 3-7 Per-agent probe count
review 3 Fleet, Verifier, Synthesis
debate 3 Opening, Rebuttal, Synthesis

Step 4: Display in HUD

Format the cost projection for the HUD/statusline display.

Standard display:

💰 Spent: $2.40 | Est. remaining: $3.60 | Total: ~$6.00

Format rules:

  • All dollar amounts to 2 decimal places
  • Projected total prefixed with ~ to indicate estimate
  • Use 💰 prefix for the cost line
  • Show in a single compact line for statusline integration

When insufficient data (< 2 steps):

💰 Spent: $0.42 (need 2+ steps for projection)

Integration: This display line is emitted by the octopus-hud hook and rendered in the statusline alongside phase progress and provider status.


Step 5: Budget Ceiling Warning

If the OCTOBUDGETCEILING environment variable is set, compare the projected total against it and warn on overrun.

if [[ -n "${OCTO_BUDGET_CEILING:-}" ]]; then
  ceiling="$OCTO_BUDGET_CEILING"
  if (( $(echo "$projected_total > $ceiling" | bc -l) )); then
    overage=$(echo "$projected_total - $ceiling" | bc -l)
    echo "⚠️ Budget ceiling: \$$ceiling — projected to exceed by \$$overage"
  fi
fi

Display when over budget:

💰 Spent: $2.40 | Est. remaining: $3.60 | Total: ~$6.00
⚠️ Budget ceiling: $5.00 — projected to exceed by $1.00

Display when within budget:

💰 Spent: $2.40 | Est. remaining: $3.60 | Total: ~$6.00
✅ Within budget ceiling: $10.00

Note: OCTOBUDGETCEILING is optional. When unset, no ceiling check is performed.


Step 6: Profile Suggestion

If the projected total is high relative to the task, suggest switching to the budget profile to reduce costs.

# Suggest budget profile when projected total exceeds $5.00 (configurable)
COST_THRESHOLD="${OCTO_COST_THRESHOLD:-5.00}"
if (( $(echo "$projected_total > $COST_THRESHOLD" | bc -l) )); then
  echo "💡 Tip: Switch to OCTO_PROFILE=budget to reduce costs"
fi

Display:

💰 Spent: $2.40 | Est. remaining: $3.60 | Total: ~$6.00
💡 Tip: Switch to OCTO_PROFILE=budget to reduce costs

The budget profile (OCTO_PROFILE=budget) routes to cheaper models and reduces agent count to minimize spend.


Complete Display Examples

Normal — within budget, moderate cost:

💰 Spent: $2.40 | Est. remaining: $3.60 | Total: ~$6.00

Over budget ceiling:

💰 Spent: $2.40 | Est. remaining: $3.60 | Total: ~$6.00
⚠️ Budget ceiling: $5.00 — projected to exceed by $1.00
💡 Tip: Switch to OCTO_PROFILE=budget to reduce costs

Early in workflow (insufficient data):

💰 Spent: $0.42 (need 2+ steps for projection)

Low cost — no warnings:

💰 Spent: $0.80 | Est. remaining: $0.80 | Total: ~$1.60

Integration

With octopus-hud hook

The cost projection line is rendered as part of the HUD statusline output, updated after each phase completes.

With metrics-tracker.sh

Reads per-phase cost data written by the metrics tracker. Each completed phase logs cost, token counts, and provider details.

With OCTO_PROFILE

When OCTO_PROFILE=budget is active, the projection accounts for reduced per-step costs from cheaper model routing.


Error Handling

No metrics directory:

💰 Cost projection unavailable — no metrics data found

Corrupted metrics data: Skip malformed entries and project from valid data only. If no valid entries remain, show unavailable message.

Zero remaining steps: When all steps are complete, show final total only:

💰 Final cost: $4.80 (4 steps)