lunchpaillola/pipa-skills

pipa-daily-shutdown

Use only when `pipa-daily-shutdown` is explicitly invoked or `pipa-improve-operations` delegates to it.

First seen Aug 6, 2026

Installation

$ npx skills add lunchpaillola/pipa-skills --skill pipa-daily-shutdown

Similar popular skills

Related neighbors and high-traction skills in the same topics — useful to compare before installing.

Also in this package

Other skills from lunchpaillola/pipa-skills · top by installs.

npx skills add lunchpaillola/pipa-skills

Browse all from lunchpaillola/pipa-skills

More details

Agent compatibility

Declared targets from SKILL.md / docs. Unmarked agents are not listed — the skill may still install via the CLI.

Claude Code Not declared
Cursor Not declared
Codex Not declared
GitHub Copilot Not declared
Windsurf Not declared
Gemini CLI Not declared
Cline Not declared
OpenCode Not declared

Repository health

Stars 3
License LICENSE
Default branch main
Open issues 0
Status Active

Skill metadata

Parsed from SKILL.md frontmatter.

Version0.1.1
More metadata
version
0.1.1

Package contents

Files included with this skill beyond the listing page.

  • skill md SKILL.md 2,488 B
  • docs SUMMARY.md 130 B

History

  1. First seen on skills.sh
  2. First recorded snapshot · 70 installs

SKILL.md

Pipa Daily Shutdown

Summarize one workday, close open loops, and prepare tomorrow. Route formal closeout work to its focused operation. Route recurring or scheduled setup to pipa-manage.

Progress

Track this checklist in working notes:

Daily Shutdown Progress
- [ ] Step 1 complete: close today
- [ ] Step 2 complete: compare plan to actual
- [ ] Step 3 complete: resolve open loops
- [ ] Step 4 complete: prepare tomorrow

Workflow

Before step 1, read [references/gotchas.md](references/gotchas.md) and [references/output-contract.md](references/output-contract.md). Use the system date for today. For another date, use the user's request or calendar. Ask one question only if the target day is unclear.

Read ~/.pipa/profile.md and ~/.pipa/CONNECTORS.md when present. Use the profile for goals and preferences. Use mapped tools when present. For unmapped capabilities, use composio-mcp discovery to find tools for project tracker, calendar, and ~~code hosting. Verify live access before reading a source. Use the tracker and calendar as core sources, code hosting for code delivery, and other sources only to resolve a specific outcome or open loop.

  1. Close today. Gather completed or advanced work, shipped artifacts, decisions, and calendar events. Separate verified completion from movement and unknown outcomes. Relate the day to a known goal; omit the goal check when none is known. A calendar event proves it was scheduled, not attended.
  2. Compare plan to actual. Use a matching Daily Plan when available. Otherwise, use target-day evidence without showing baseline unavailable. If the user asks for a comparison, include it in completed, moved, and open work.
  3. Resolve open loops. Give each important unfinished item one disposition: carry forward, delegate, schedule, defer, drop, or TBD. Add a next action when possible.
  4. Prepare tomorrow. Find the likely first priority, first action, and known calendar constraint. Do not create tasks or events.

Write the read-only shutdown with [references/output-contract.md](references/output-contract.md). Show each exact external write and require separate approval before execution; report its result. End with a short sources line that names only the apps and material records used.