kucherenko/gangsta

resource-development

Use when the contract is signed and work packages need to be created — decomposes the contract into bite-sized tasks, sets up git isolation, allocates territories and token budgets, producing the execution plan

First seen Apr 17, 2026

Installation

$ npx skills add kucherenko/gangsta --skill resource-development

Similar popular skills

Related neighbors and high-traction skills in the same topics — useful to compare before installing.

Also in this package

Other skills from kucherenko/gangsta · top by installs.

npx skills add kucherenko/gangsta

Browse all from kucherenko/gangsta

More details

Agent compatibility

Declared targets from SKILL.md / docs. Unmarked agents are not listed — the skill may still install via the CLI.

Claude Code Not declared
Cursor Not declared
Codex Not declared
GitHub Copilot Not declared
Windsurf Not declared
Gemini CLI Not declared
Cline Not declared
OpenCode Not declared

Repository health

Stars 80
License LICENSE
Default branch master
Open issues 1
Status Active

Package contents

Files included with this skill beyond the listing page.

  • skill md SKILL.md 4,040 B
  • docs SUMMARY.md 240 B

History

  1. First seen on skills.sh
  2. First recorded snapshot · 34 installs

SKILL.md

Resource Development: Infrastructure and Tooling

Overview

The Underboss decomposes the signed Contract into Work Packages, sets up infrastructure for parallel execution, and produces the Execution Plan — the detailed task breakdown that governs The Hit.

Trigger

Invoked after the Don signs the Contract (The Sit-Down complete).

Process

Step 1: Decompose Contract into Work Packages

For each requirement in the Contract:

  1. Identify affected files (create/modify)
  2. Determine territory ownership (which Crew Lead)
  3. Define acceptance criteria (from Contract)
  4. Write verification command
  5. Estimate token budget

Each Work Package must be:

  • Independent — Can be implemented without waiting for other Work Packages (within the same territory, order may matter)
  • Verifiable — Has a specific test or command that proves it works
  • Bite-sized — 2-5 minutes of Worker tasks
  • Traceable — References a specific Contract clause

Step 2: Define Territories

Group Work Packages by domain and define Crew Lead territories:

## Territory: <Name>
**Domain:** <Description>
**Files:** <Glob patterns>
**Work Packages:** WP-001, WP-003, WP-007
**Workers:** <Parallel count>
**Budget:** <Token allocation>

Step 3: Set Up Isolation

If the project uses git:

  • Create a branch for the Heist: heist/<heist-name>
  • Optionally create worktrees per territory for true parallel work

If not:

  • Document the isolation strategy (directory copies, etc.)

Step 4: Verify Prerequisites

Before The Hit begins:

  • All existing tests pass on the current baseline
  • Required dependencies are available
  • File paths in Work Packages are valid
  • No merge conflicts with the base branch

Step 5: Produce Execution Plan

Compile everything into the Execution Plan.

Execution Plan Format

Save to: docs/gangsta/<heist-name>/plans/YYYY-MM-DD-execution-plan.md

---
heist: <heist-name>
date: YYYY-MM-DD
total-work-packages: <N>
territories: <N>
estimated-total-budget: <tokens>
---

# Execution Plan: <Heist Name>

## Territories

### Territory: <Name 1>
**Crew Lead Domain:** <description>
**Files:** <globs>
**Workers:** <N parallel>
**Budget:** <tokens>

### Territory: <Name 2>
...

## Work Packages

**Prevention Guidance (all Work Packages):** Do NOT reproduce Gangsta-internal spec identifiers (FR-xxx, NFR-xxx, WP-xxx, where xxx is one or more digits) in any deliverable — source code, test files, code comments, or documentation. These identifiers belong only in `docs/gangsta/`.

### WP-001: <Title>
**Territory:** <Name>
**Contract Clause:** <FR-NNN>
**Files:**
- Create: `path/to/file`
- Test: `tests/path/to/test`
**Acceptance Criteria:**
1. <criterion>
**Verification:** `<command>`
**Budget:** <tokens>
**Dependencies:** None | WP-XXX

### WP-002: <Title>
...

## Execution Order
1. Independent packages (can run in parallel): WP-001, WP-002, WP-005
2. Depends on group 1: WP-003 (needs WP-001)
3. ...

## Baseline Verification
- Tests: <PASS/FAIL — must be PASS>
- Dependencies: <OK/MISSING>
- Branch: heist/<heist-name> created from <base>

Step 6: Don Approves Execution Plan

Present to the Don:

"Execution Plan ready. <N> Work Packages across <N> territories. Estimated budget: <tokens>. Ready to execute The Hit?"

Checkpoint

---
heist: <heist-name>
phase: resource-development
status: completed
timestamp: <ISO 8601>
next-action: Proceed to The Hit
artifacts:
  - docs/gangsta/<heist-name>/plans/YYYY-MM-DD-execution-plan.md
---

Omerta Compliance

  • Spec is Law: Every Work Package traces to a Contract clause
  • Rule of Budget: Token budgets allocated per territory
  • Rule of Availability: Execution Plan and checkpoint saved