kensaurus/cursor-kenji

workflow-launch-ready

Full launch preparation sweep for a new app or major release. Use when "prepare for launch", "launch week", "everything before going live", "is the app launch-ready?", "pre-launch sweep", or "ship it to the world". Local working-tree PR prep → workflow-release-prep.

First seen Jun 15, 2026

Installation

$ npx skills add kensaurus/cursor-kenji --skill workflow-launch-ready

Similar popular skills

Related neighbors and high-traction skills in the same topics — useful to compare before installing.

Also in this package

Other skills from kensaurus/cursor-kenji · top by installs.

npx skills add kensaurus/cursor-kenji

Browse all from kensaurus/cursor-kenji

More details

Agent compatibility

Declared targets from SKILL.md / docs. Unmarked agents are not listed — the skill may still install via the CLI.

Claude Code Not declared
Cursor Not declared
Codex Not declared
GitHub Copilot Not declared
Windsurf Not declared
Gemini CLI Not declared
Cline Not declared
OpenCode Not declared

Repository health

Stars 9
License LICENSE
Default branch main
Open issues 0
Status Active

Skill metadata

Parsed from SKILL.md frontmatter.

LicenseMIT

Package contents

Files included with this skill beyond the listing page.

  • skill md SKILL.md 4,795 B
  • docs SUMMARY.md 297 B

History

  1. First seen on skills.sh
  2. First recorded snapshot · 28 installs

SKILL.md

workflow-launch-ready — Full Launch Preparation

Degree of freedom: MIXED. Skip/condition judgment [HIGH freedom]; sweep order and quality-gate NO-GO block [LOW freedom — run exactly].

The pre-launch sequence. Run once, get the complete picture across SEO, PWA, performance, quality, and post-launch monitoring.

Local dirty-tree → merge-ready PR is workflow-release-prep, not this.

How to reason

  1. Scope — new app / major release, not a dirty-tree PR
  2. Sweep — which steps apply; which are honest skips
  3. Verdict — LAUNCH-READY / WITH CONDITIONS / NOT READY
  4. Handoff — day-1 loop scheduled; blockers named

Worked example

Scope: first public launch of a Next.js + Supabase app; single locale; PWA wanted.
Sweep: SEO + PWA + bundle + quality-gate; skip i18n with a note.
Verdict: NOT READY — quality-gate NO-GO on missing RLS on profiles.
Handoff: fix RLS, re-run Gate 2, then deploy-verify; do not treat this as workflow-release-prep.

Self-critique before reporting

  • Not a PR-prep — local dirty tree was not routed here
  • Skips named — PWA/i18n skipped only when inapplicable, in the table
  • NO-GO blocks launch — quality-gate NO-GO is NOT READY, not "with conditions"
  • Right owner — merge-ready PR → workflow-release-prep; npm package → deploy-npm

Sweep sequence [LOW freedom — run exactly]

1. SEO          → enhance-web-seo    (meta, OG, JSON-LD, sitemap, canonicals)
2. PWA          → enhance-pwa        (manifest, service worker, offline, install)
3. BUNDLE       → audit-bundle-size  (first-load JS ≤ 200 KB goal)
4. i18n         → audit-i18n         (if multi-locale: natural copy, no hardcoded strings)
5. QUALITY GATE → workflow-quality-gate (red-team + security + perf + unit tests)
6. DEPLOY       → deploy-verify      (post-deploy smoke after the release)
7. ITERATE      → iterate-post-launch (close loop on day-1 production signals)

Skip steps 2 (PWA) and 4 (i18n) if not applicable — note the skip in the checklist.


Step 1: SEO (read enhance-web-seo) [HIGH freedom]

Read the enhance-web-seo skill and follow it.

Every public page needs: <title>, meta description, OG tags, canonical URL, structured data (JSON-LD), and a sitemap entry.


Step 2: PWA (read enhance-pwa) [HIGH freedom]

Read the enhance-pwa skill and follow it.

Required: Web App Manifest + service worker with offline fallback. Lighthouse PWA score ≥ 90 before launch.


Step 3: Bundle size (read audit-bundle-size) [HIGH freedom]

Read the audit-bundle-size skill and follow it.

Target: first-load JS ≤ 200 KB gzip. All routes lazy-loaded.


Step 4: i18n (read audit-i18n — skip if single locale) [HIGH freedom]

Read the audit-i18n skill and follow it.

Priority: no hardcoded user-facing strings, natural copy in all supported locales, correct date/number/currency formatting.


Step 5: Quality gate (read workflow-quality-gate) [LOW freedom — hand off]

Read the workflow-quality-gate skill and follow it.

This step runs test-red-team, audit-security, audit-performance, and test-unit internally. A NO-GO verdict from this step blocks launch.


Step 6: Deploy & smoke (read deploy-verify) [LOW freedom — hand off]

Read the deploy-verify skill and follow it.

Run immediately after the production deploy. Confirm no new Sentry errors, schema is healthy, and critical flows work.


Step 7: Day-1 iteration loop (read iterate-post-launch) [LOW freedom — hand off]

Read the iterate-post-launch skill and follow it.

Schedule this 24–48 hours after launch. Pull first real-user signals and prioritize the first fix pass.


Launch checklist output [LOW freedom — run exactly]

## Launch Readiness — [App] — [Date]

### Verdict: LAUNCH-READY / LAUNCH WITH CONDITIONS / NOT READY

| Step | Status | Open items |
|------|--------|------------|
| SEO | ✅ / ⚠️ / ❌ | [list] |
| PWA | ✅ / ⚠️ / ❌ / skipped | [list] |
| Bundle size | ✅ / ⚠️ / ❌ | [X KB] |
| i18n | ✅ / ⚠️ / skipped | [list] |
| Quality gate | GO / NO-GO / CONDITIONAL | [see gate report] |
| Deploy smoke | ✅ / ❌ | [notes] |
| Day-1 plan | scheduled / not yet | [date] |

### Blockers (must fix before launch)
[list]

### Post-launch backlog (fix within 48 h)
[list]