Safe migration playbook with hard gates and HITL for production risk: plan locks/rollback → implement schema-only migration → migrate/rollback/re-migrate → never mix backfill → expand-contract for NOT NULL → suite green.

First seen Jun 20, 2026

Installation

$ npx skills add igmarin/elixir-phoenix-skills --skill ecto-migration

Similar popular skills

Related neighbors and high-traction skills in the same topics — useful to compare before installing.

Also in this package

Other skills from igmarin/elixir-phoenix-skills · top by installs.

npx skills add igmarin/elixir-phoenix-skills

Browse all from igmarin/elixir-phoenix-skills

More details

Agent compatibility

Declared targets from SKILL.md / docs. Unmarked agents are not listed — the skill may still install via the CLI.

Claude Code Not declared
Cursor Not declared
Codex Not declared
GitHub Copilot Not declared
Windsurf Not declared
Gemini CLI Not declared
Cline Not declared
OpenCode Not declared

Repository health

Stars 2
License LICENSE
Default branch main
Open issues 0
Status Active

Skill metadata

Parsed from SKILL.md frontmatter.

Version1.0.0
LicenseMIT
More metadata
version
1.0.0
user-invocable
true
entry_point
1
phases
Phase 1: Plan, Phase 2: Implement, Phase 3: Migrate cycle, Phase 4: Verify
hard_gates
Plan and rollback documented, No combined schema and data migrations, Migrate-rollback-migrate cycle green, Format Credo and full suite green
dependencies
{"source":"self","skills":["ecto-essentials","apply-ecto-conventions"]}

Package contents

Files included with this skill beyond the listing page.

  • skill md SKILL.md 4,636 B
  • docs SUMMARY.md 335 B

History

  1. First seen on skills.sh
  2. First recorded snapshot · 22 installs

SKILL.md

Ecto Migration Playbook

HARD-GATE

  • A migration plan and rollback story are documented before any migration is written.
  • Schema changes and data backfill are never combined in the same migration.
  • A test that depends on the new schema/constraint fails before the migration is applied and passes after.
  • The mix ecto.migrate → mix ecto.rollback → mix ecto.migrate cycle must succeed.
  • mix format --check-formatted, mix credo --strict, and the full mix test suite are green.
  • HITL approval is obtained for production-impacting locks.

When to use

Any schema change: tables, columns, indexes, constraints.

Atomic skills this playbook loads

Skill Path Role
ecto-essentials skills/ecto-essentials/ Migrations/schemas
apply-ecto-conventions skills/apply-ecto-conventions/ Repo/query conventions

Flow

flowchart TD
  A[Plan locks rollback impact] --> B[HITL if prod risk]
  B --> C[Write schema migration]
  C --> D[migrate rollback migrate]
  D --> E[Suite green]
  E --> F[Separate backfill migration if needed]

Agent Phases

Phase 1 — Plan

Assess: lock risk, expand-contract need, rollback strategy, index concurrency.

HUMAN-IN-THE-LOOP: for production-impacting locks or multi-step expand-contract, present plan and wait for approval.

HARD GATE — Plan and rollback documented:

  • Lock risk and index concurrency are assessed.
  • Rollback strategy is documented.
  • For production-impacting locks, HITL approval is obtained.

If gate fails: Re-document the plan and rollback; do not write the migration until the plan is approved.

Phase 2 — Implement

  • Schema change or data backfill — never both in one migration
  • Indexes on FKs; reversible change/0 when possible

HARD GATE — No combined schema and data migrations:

  • The migration changes schema or performs a data backfill, not both.
  • Indexes are added on foreign keys.
  • change/0 is reversible or separate up/down functions are provided.

If gate fails: Split the migration into a schema migration and a separate backfill migration.

Phase 3 — Migrate cycle

mix ecto.migrate
mix ecto.rollback
mix ecto.migrate

HARD GATE — Migrate-rollback-migrate cycle green:

  • mix ecto.migrate → mix ecto.rollback → mix ecto.migrate succeeds.

If gate fails: Fix the migration reversibility before proceeding.

Phase 4 — Verify

mix test

Update schemas/typespecs if columns changed.

HARD GATE — Format Credo and full suite green:

  • A test that depends on the new schema/constraint failed before the migration and passes after.
  • mix test, mix format --check-formatted, and mix credo --strict pass.
  • Schemas and typespecs are updated if columns changed.

If gate fails: Update schemas/typespecs, fix formatting, Credo, or test failures.

Verification checklist

  • Plan + rollback noted
  • No combined schema+backfill
  • migrate/rollback/migrate OK
  • Tests green
  • HITL for high-risk prod steps

Error Recovery

Irreversible migration → stop; write compensating migration; do not force production.

Output Style

## Ecto Migration Report

**Plan:** <lock risk, rollback strategy, HITL status>
**Migration:** `<migration filename>`
**HARD-GATE results:**
- Plan and rollback documented: PASS / FAIL
- No combined schema and data migrations: PASS / FAIL
- Migrate-rollback-migrate cycle green: PASS / FAIL
- Format Credo and full suite green: PASS / FAIL
**Command results:**
- `mix ecto.migrate`: exit 0 / non-zero
- `mix ecto.rollback`: exit 0 / non-zero
- `mix test`: exit 0 / non-zero
**Verdict:** APPROVE / REQUEST_CHANGES