gtrabanco/agentic-workflow

planning-preflight

Internal planning gate: consumes the normalized repository state and makes the ONE final architectural classification, using a two-stage contract that allows a lightweight NRS read during planning and a full architectural classification after the plan is cut. Used by plan-feature, plan-feature-from-issue, plan-feature-scaffold, and plan-fix. Not a menu entry.

First seen Aug 9, 2026

Installation

$ npx skills add gtrabanco/agentic-workflow --skill planning-preflight

Similar popular skills

Related neighbors and high-traction skills in the same topics — useful to compare before installing.

Also in this package

Other skills from gtrabanco/agentic-workflow · top by installs.

npx skills add gtrabanco/agentic-workflow

Browse all from gtrabanco/agentic-workflow

More details

Agent compatibility

Declared targets from SKILL.md / docs. Unmarked agents are not listed — the skill may still install via the CLI.

Claude Code Not declared
Cursor Not declared
Codex Not declared
GitHub Copilot Not declared
Windsurf Not declared
Gemini CLI Not declared
Cline Not declared
OpenCode Not declared

Repository health

Stars 21
License LICENSE
Default branch main
Open issues 21
Status Active

Skill metadata

Parsed from SKILL.md frontmatter.

Version1.1.1
LicenseMIT

Package contents

Files included with this skill beyond the listing page.

  • skill md SKILL.md 5,410 B
  • docs SUMMARY.md 387 B

History

  1. First seen on skills.sh
  2. First recorded snapshot · 22 installs

SKILL.md

Planning Preflight (internal)

The single owner of the planning-side repository gates. plan-feature and plan-fix consume this one contract instead of each internal repeating its own normalized-state read and architectural classification.

This skill uses a two-stage contract to resolve the tension between: (1) the need for planners to read the NRS early (architecture discovery is read-only and required to inform the plan), and (2) the requirement that the final architectural classification only happens after the complete engineering plan exists.

When to use

Any planner route that can write planning artifacts:

  • plan-feature — every route that will scaffold (scoped, issue, --next).
  • plan-fix — every fix-SPEC draft.

Composed internals (plan-feature-from-issue, plan-feature-scaffold) consume the same result via the in-turn planning context the router creates; they never re-run discovery or classification.

Two-Stage Contract

Stage 1 — NRS read during planning (lightweight)

While the plan is still being built, routers may perform a read-only consumption of the normalized repository state (NRS) for architectural context. At this stage only the NRS port is classified; the architectural classification is deferred.

Record the Stage 1 result using the following format:

Preflight: Stage 1 — NRS <consumed|n/a> · arch: deferred

This result informs the plan but does not block emission.

Stage 2 — Full classification after plan cut (final)

Once the complete engineering plan exists (the SPEC is filled and the phases are cut), run the FULL architectural classification exactly once per plan — never per-composed-internal.

Discover the optional project invariant document declared in the documentation map (normally docs/architecture/ARCHITECTURAL_INVARIANTS.md). If absent, record n/a: no project invariants declared and pass. For every applicable rule, cite its ID and repository evidence and classify the planned change as preserves, violates, introduces, or changes. Only preserves may reach emission. A violation, new rule, or changed rule stops for an explicit architectural decision through the project's declared authority; never convert it into an engineering task or infer approval from the SPEC. Use frozen NRS facts when available, but repository inspection remains authoritative.

Record the Stage 2 result using the following format:

Preflight: NRS <consumed|n/a> · invariant classification: <preserves|violates|introduces|changes> (n/a when no invariants declared)

When to run Stage 2

Run Stage 2 immediately after the engineering plan is complete and before the router emits artifacts. This is the gate that decides whether the plan can be emitted or must stop for an architectural decision.

Stage 2 must also run whenever a previously-passed plan is re-validated after the engineering plan changes (e.g., a new phase was added or the SPEC was expanded). In that case, re-run only the invariant rules that may have been affected by the change.

Step 0 — Consume the normalized repository state

When docs/workflow/REPOSITORY_STATE.md exists, plan from its frozen facts and decisions. An absent fact may be inspected; a conflict is a resolver contradiction, never a rewrite. Planned work and documentation are not implementation evidence. A present ledger whose status is draft, contradicted, or resolved stops planning and routes to discovery or resolution first. If no ledger exists, inspect the repository directly and record n/a: no normalized repository state; NRS is optional.

Result — fixed classification record

Return exactly one line back to the router:

  • Stage 1 (while planning):
Preflight: Stage 1 — NRS <consumed|n/a> · arch: deferred
  • Stage 2 (after plan is cut, final gate):
Preflight: NRS <consumed|n/a> · invariant classification: <preserves|violates|introduces|changes> (n/a when no invariants declared)

preserves (or n/a: no project invariants declared) → the router proceeds to emit the artifacts and register the roadmap/fix entry. Any other classification → STOP with the fixed ARCHITECTURAL INVARIANT GATE BLOCKED block:

→ Next: resolve the architectural decision first — <rule-id>: <classification> (<evidence>).
  Run /design-feature or the project's declared decision authority; do not convert this into a phase task.

Guardrails

  • One classification per plan, taken after the engineering plan exists — never

in each composed internal.

  • Never let the SPEC, a passing test, or a roadmap row infer the decision.
  • Docs only — no code, no branch, no forge writes.
  • Two-stage contract: Stage 1 is lightweight NRS read; Stage 2 is the final

architectural gate. Stage 2 supersedes Stage 1 for emission decisions.